Steep Costs in Pilot Could Mean Some Riskier Corps Levees
"Four years after redrawing its levee-design assumptions to ensure that the failures of Hurricane Katrina were never repeated, the Army Corps of Engineers has embarked on a study that threatens to relax the new, more stringent standards in ways that would reduce costs — and result in less protection in some areas."